• Home /
  • Projects /
  • Construction of Sewage and Stormwater system in (Al Aweer Area)

Construction of Sewage and Stormwater system in (Al Aweer Area)

Client Name :

Mohammed Abdulmohsin Al Kharafi& Sons

Location :

Al Aweer

Contract Value :

2,941,647.45 AED

Challenge :

The area required a fully integrated sewer and stormwater network to support rapid urban growth and mitigate seasonal flooding.

Solution :

Supplied and installed 20,000 meters of UPVC pipes (160mm & 200mm) at depths up to 2.5 meters, including final inspection chambers (FICs) for house connections.

Outcome :

Enhanced sanitation, improved flood protection, and sustainable infrastructure development in Al Aweer.
AJ INFRA
AJ INFRA
error: Content is protected !!
Scroll to Top